Hydro-morphodynamic numerical modeling indicates risk zones for riverbed clogging

Field site and available data

The study was conducted on a morphodynamic fishway bypassing the Ering–Frauenstein hydropower plant on the lower Inn River in Germany. The fishway extends about 2.6 km and exhibits a near-natural morphology with…

Continue Reading